Project Cargo Photo Gallery


 

Fastening process

Workers fastening a beverage tank (23m long) to 4 axes railway transporter

Fastening Process #2

Project cargo secured on the transporter according to the specific loading procedure.

Secured to the transporter

Beverage tank secured to the railway transporter, ready to get moving

Cargo in transit

Transporter with cargo locked to a train

Lifting at destination

Beverage tank arrived, being lifted from railway transporter.

Unloading the vessel

Several pieces of project cargo being unloaded from the river

Truck on the move

Several pieces of project cargo loaded onto low-bed trailers

Lifting the wires

Workers lift power lines as trucks with project cargo approach.

The biggest transporter

An extra heavy transformer (500MT) secured on 32-axes railway transporter ready to depart

Project cargo on the vessel

Several pieces of project cargo arrived in a vessel to be transported to inland location

Tank on low-bed trailer

Tank loaded onto low-bed trailer in transit to destination

Police convoy

Observe local police stop the traffic on the highway to let the project cargo trough

Lifting railway power lines

Observe workers lift the wires of railway power line to allow the truck with project cargo to pass